NANC Change Orders

The NANC Change Order section contains descriptions of the business functionality of the Number Portability Administration Center (NPAC) Service Management System (SMS) as defined by the Local Number Portability Administration Working Group (LNPA WG), which has a direct relationship to the processes and systems that each Service Provider uses to participate in LNP.

When a change in the NPAC software design is discussed at the LNPA WG, the proposed change eventually is described in the form of a change order. The change order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the change order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. (Operational impacts of a change order are described in "Method & Procedures" documents issued before the change order is implemented.) In this section of the LNPA WG web site, all change orders ever considered are listed. The final change order document and the LNPA WG discussion notes, the change order's status, and the identity of the software release in which the change order was implemented are provided here.

The status of a change order may be either Closed, Open, Implemented, or Requested. These terms are defined as follows:

  • Closed – The change order was considered and rejected.
  • Open – The change order has been considered and there may be further discussion.
  • Implemented – The change order was adopted and has been implemented in the NPAC system.
  • Requested – The LNPA TOSC has reached agreement on the Change Order and either a SOW may be requested or the requirements updates (Doc Only) will be included in a future version of the Industry Document(s).

Summary & Guidelines


Title Date Originated Description Status Documents
ILL 011 10/17/1996 Portability Area Utilities, Screen, and Report Enhancements Closed Download
ILL 010 10/17/1996 Billing Enhancements Closed Download
ILL 009 10/17/1996 Portability Area Specific Tunables Closed Download
ILL 008 10/17/1996 Portability Areas Closed Download
ILL 005 10/15/1996 Round-Robin Broadcasts Across LSMS Associations Closed Download
ILL 003 10/15/1996 Enhancements to Screening of NPA-NXX Broadcasts Closed Download

581 results returned