Problems and Issues Management

In late 1999, the LNPA WG, now known as the Number Portability Industry Forum (NPIF), established a "Problem Identification and Management" (PIM) process for Number Portability (np) issues. The group, made up of Number Portability Industry members, developed:

  • Issue submittal guidelines (PIM Process Scope)
  • Issue submittal form (Problem/Issue Identification and Description Form)
  • Issue referral form (Problem/Issue Referral Cover Letter)
  • Process flows (PIM Process Flow Narratives and PIM Process Flow Graphics)
  • Tracking mechanism (PIMs Tracking Matrix)

The NPIF is not responsible for resolving all Number Portability problems. The NPIF performs an initial evaluation of each problem/issue submitted, then either develops a resolution for the issue or refers it to the appropriate forum for resolution. Issues submitted are tracked in the PIMs Tracking Matrix.

Issues should be submitted to the NPIF using the Problem/Issue Identification and Description Form, at least two weeks before the NPIF meeting at which Number Portability issue's discussion is desired.


 

Related Documents


 

Title Date Description Document
PIM 128 02/25/2020 The LNPA observes that LSMS operators are performing maintenance tasks outside of the scheduled maintenance windows on Sundays. When LSMS systems are unavailable, it has a detrimental effect on port… Download
PIM 127 09/10/2019 The Billing ID field for SVs is defined in the FRS as: “For future use. Can be variable 1-4 alphanumeric characters.” The Alt-Billing ID field is defined as a variable 1-4 character string (no limi… Download
PIM 126 07/09/2019 The XML Interface Specification (XIS), currently does not specify the Content Type to be used in interface messages except in the message examples. Since multiple Content Types can be used and have b… Download
PIM 125 07/09/2019 Prior to the NPAC Transition, a separate test plan document outside of the Certification and Regression Testing Plan was developed to test Notification Suppression (for XML) in NANC Release 3.4.8, pu… Download
PIM 124 03/05/2019 The LNPA has observed that on several occasions that the current service provider has attempted to modify an active subscription version (SV) by simultaneously submitting both a modify active request… Download
PIM 123 03/05/2019 iconectiv developed recovery capabilities based on NPAC SMS FRS requirements to allow CMIP-based local systems to recover Subscription Version and Network data elements. During industry discussions, … Download
PIM 122 03/05/2019 The Industry, through a series of discussions (dating back approximately 20+ years), concluded that the appropriate retry and time interval would be 1x15 due to messages not lost on interface so retr… Download
PIM 121 09/11/2019 During transition, it became apparent to iconectiv that there were a number of SPIDs in the NPAC database that were no longer in use. iconectiv has carefully planned a clean-up process for obsolete … Download
PIM 120 09/11/2019 The Alternate SPID attribute was introduced in NANC 399 in Release 3.3. The Last Alternate SPID attribute was then added in NANC 438 in Release 3.3.4. During transition, iconectiv noticed that a num… Download
PIM 119 09/11/2019 The NPA-NXX Create will be rejected if the ownership information is not present in the NPAC SMS industry reference data. Service Providers sometimes experience NPA-NXX Create rejections when they a… Download
PIM 118 07/05/2018 During transition, iconectiv was required to outreach to every SPID defined in the NPAC database or assigned to an NPAC user. One discovery was that some SPIDs were either choosing to not onboard or … Download
PIM 117 07/05/2018 One function of the LNPA is to assign SPIDs (NPAC Customer ID) and Names for approved applicants to NPAC. During the transition, iconectiv presented its SPID Naming methodology. No such defined metho… Download
PIM 116 07/05/2018 Over time the Typing of SPIDs was inconsistent manifesting in X SPIDs that were created for use for Associations to receive LSMS downloads. Previously some of these SPIDs were typed as Wireless or Wi… Download
PIM 115 05/09/2018 iconectiv has observed that Audits created with an Activation Time Range are not executing as expected. Download
PIM 114 05/09/2018 Based on feedback from SV BDD users in regions where the LNPA has transitioned, there appears to be implementation differences between the Neustar and iconectiv NPAC’s implementation of full SV BDD f… Download
PIM 113 05/09/2018 SV modify requests on pending SVs that contain a due date that is identical to and does not modify the due date on the SV in the NPAC DB does not send Attribute Value Change (AVC) notifications to th… Download
PIM 112 04/24/2018 Based on discussions at the April 4, 2018 NANC (LNPA) Transition Oversite Sub-Committee (TOSC) conference call, there is differences in implementation between the Nuestar and iconeciv NPAC concerning… Download
PIM 111 04/24/2018 During SPID Migration processing, a local system had issues in processing the SPID Migration files produced by the iconectiv NPAC. The SPID Migration only involved NPA-NXXs being migrated and the ic… Download
PIM 110 03/12/2018 In a typical Software Development process, requirements are explicitly defined and numbered so that such requirements can be developed and fully tested and the traceability to verify that every requi… Download
PIM 109 03/12/2018 Based on feedback from current users of the Neustar NPAC, there appears to be a need to utilize Hold – Replay functionality for CMIP mechanized users that is not related to those users transitioning … Download
PIM 108 03/06/2018 Based on feedback from a current user of the Neustar NPAC, there appears to be implementation differences between the Neustar and iconectiv NPAC’s implementation of the XML Hold/Replay functionality.… Download
PIM 107 03/06/2018 An issue was raised in the industry concerning documenting and maintaining the MUMP File spreadsheets. The understanding was that the implementation was vendor specific, and the implementations may … Download
PIM 106 03/06/2018 iconectiv implemented the BDD files based on the NPAC SMS FRS BDD requirements and examples in Appendix E. During certification and regression testing of the iconectiv NPAC vendors and mechanized se… Download
PIM 105 02/14/2018 During iconectiv LNPA transition testing of a local system, issues were discovered that impact the execution and/or verification of an Industry Group Test Case. These issues relate to a nonconforman… Download
PIM 104 01/26/2018 Based on feedback from current users of the Neustar NPAC and based on iconectiv’s own experience with BDD files from Neustar, it appears as though full BDD files – though not delta BDD files – may be… Download