Problems and Issues Management

In late 1999, the LNPA WG established a "problem identification and management process" (PIM) for LNP issues. The LNPA WG is not responsible for resolving all LNP problems. The LNPA WG does an initial evaluation of each LNP problem submitted, then either develops a resolution for the issue or refers the issue to the appropriate forum for resolution. The status of each LNP issue submitted is reported to the NANC on a regular basis.

The LNPA WG has developed issue submittal guidelines, an issue submittal form, process flows, and a tracking mechanism. Issues should be submitted to the LNPA WG, using the issue submittal form, at least two weeks before the LNPA WG meeting at which LNP issue's discussion is desired. 2009-08-03 PIM Conference Call Notes.pdf


Related Documents


Title Date Description Document
PIM 108 03/06/2018 Based on feedback from a current user of the Neustar NPAC, there appears to be implementation differences between the Neustar and iconectiv NPAC’s implementation of the XML Hold/Replay functionalit... Download
PIM 107 03/06/2018 An issue was raised in the industry concerning documenting and maintaining the MUMP File spreadsheets. The understanding was that the implementation was vendor specific, and the implementations ma... Download
PIM 106 03/06/2018 iconectiv implemented the BDD files based on the NPAC SMS FRS BDD requirements and examples in Appendix E. During certification and regression testing of the iconectiv NPAC vendors and mechanized ... Download
PIM 105 02/14/2018 During iconectiv LNPA transition testing of a local system, issues were discovered that impact the execution and/or verification of an Industry Group Test Case. These issues relate to a nonconform... Download
PIM 104 01/26/2018 Based on feedback from current users of the Neustar NPAC and based on iconectiv’s own experience with BDD files from Neustar, it appears as though full BDD files – though not delta BDD files – may ... Download
PIM 103 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 102 08/22/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 101 08/22/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 100 08/04/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 99 08/04/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 98 08/04/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 97 07/31/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 96 07/31/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 95 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 94 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 93 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 92 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 91 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 90 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 89 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 88 07/12/2016 Some Service Providers do not have a contact number to assist with porting fallout questions. Instead, the carriers rely on e-mail. There are not any documented guidelines around using email for ... Download
PIM 87 03/30/2016 LNPA WG Best Practices reflect the consensus of the working group regarding the preferred processes for porting. Best Practice 0004, N-1 Carrier Methodology Clarification, was originally submitted... Download
PIM 86 05/12/2015 Originally submitted as per below, seeking consensus to amend the scope of this PIM to address overall challenges related to claims of an unauthorized port in order to develop one cohesive PIM and ... Download
PIM 85 04/01/2015 Consumers are experiencing negative porting experiences as a result of the lack of uniformity and clarity in processes that drives port completion timeframes. We are allowing resellers to validate ... Download
PIM 84 12/05/2014 There is not an industry defined process interval for Wireless to Wireline and Wireless to Wireless reseller ports. Reseller ports are not considered simple ports, they are complex. There is not... Download

132 results returned