Problems and Issues Management

In late 1999, the LNPA WG, now known as the Number Portability Industry Forum (NPIF), established a “Problem Identification and Management” process (PIM) for Number Portability (NP) issues.  The group, made up of Number Portability Industry members, developed:

  • Issue submittal guidelines (PIM Process Scope)
  • Issue submittal form (Problem/Issue Identification and Description Form)
  • Issue referral form (Problem/Issue Referral Cover Letter)
  • Process flows (PIM Process Flow Narratives and PIM Process Flow Graphics)
  • Tracking mechanism (PIMs Tracking Matrix)

The NPIF is not responsible for resolving all NP problems. The NPIF performs an initial evaluation of each problem/issue submitted, then either develops a resolution for the issue or refers it to the appropriate forum for resolution. Issues submitted (PIM) are tracked in the PIMs Tracking Matrix.

Issues should be submitted to the NPIF using the Problem/Issue Identification and Description Form, at least two weeks before the NPIF meeting at which Number Portability issue's discussion is desired. 


Related Documents


Title Date Description Document
PIM 115 05/09/2018 iconectiv has observed that Audits created with an Activation Time Range are not executing as expected. Download
PIM 114 05/09/2018 Based on feedback from SV BDD users in regions where the LNPA has transitioned, there appears to be implementation differences between the Neustar and iconectiv NPAC’s implementation of full SV BDD... Download
PIM 113 05/09/2018 SV modify requests on pending SVs that contain a due date that is identical to and does not modify the due date on the SV in the NPAC DB does not send Attribute Value Change (AVC) notifications to ... Download
PIM 112 04/24/2018 Based on discussions at the April 4, 2018 NANC (LNPA) Transition Oversite Sub-Committee (TOSC) conference call, there is differences in implementation between the Nuestar and iconeciv NPAC concerni... Download
PIM 111 04/24/2018 During SPID Migration processing, a local system had issues in processing the SPID Migration files produced by the iconectiv NPAC. The SPID Migration only involved NPA-NXXs being migrated and the ... Download
PIM 110 03/12/2018 In a typical Software Development process, requirements are explicitly defined and numbered so that such requirements can be developed and fully tested and the traceability to verify that every req... Download
PIM 109 03/12/2018 Based on feedback from current users of the Neustar NPAC, there appears to be a need to utilize Hold – Replay functionality for CMIP mechanized users that is not related to those users transitionin... Download
PIM 108 03/06/2018 Based on feedback from a current user of the Neustar NPAC, there appears to be implementation differences between the Neustar and iconectiv NPAC’s implementation of the XML Hold/Replay functionalit... Download
PIM 107 03/06/2018 An issue was raised in the industry concerning documenting and maintaining the MUMP File spreadsheets. The understanding was that the implementation was vendor specific, and the implementations ma... Download
PIM 106 03/06/2018 iconectiv implemented the BDD files based on the NPAC SMS FRS BDD requirements and examples in Appendix E. During certification and regression testing of the iconectiv NPAC vendors and mechanized ... Download
PIM 105 02/14/2018 During iconectiv LNPA transition testing of a local system, issues were discovered that impact the execution and/or verification of an Industry Group Test Case. These issues relate to a nonconform... Download
PIM 104 01/26/2018 Based on feedback from current users of the Neustar NPAC and based on iconectiv’s own experience with BDD files from Neustar, it appears as though full BDD files – though not delta BDD files – may ... Download
PIM 103 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 102 08/22/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 101 08/22/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 100 08/04/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 99 08/04/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 98 08/04/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 97 07/31/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 96 07/31/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 95 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 94 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 93 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 92 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download
PIM 91 07/11/2017 During iconectiv LNPA transition testing of a local system, issues were discovered that impacts the execution and/or verification of an Industry Test Case (ITC) required for certification. These i... Download

140 results returned