Change Orders
The Change Order section contains descriptions of the business functionality of the Number Portability Administration Center Service Management System (NPAC/SMS) as defined by the Number Portability Industry Forum (NPIF). The NPIF was formerly known as the Local Number Portability Administration Working Group (LNPA WG). Change Orders created/managed prior to the restructuring are identified with ‘NANC’ before the Change Order number. The NPIF has a direct relationship to the processes and systems that each Service Provider uses to participate in Number Portability.
When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required.
In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.
The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:
- Closed – The Change Order was considered and rejected.
- Open – The Change Order has been considered and there may be further discussion.
- Requested – The NPIF has reached agreement on the Change Order and either a Statement of Work (SOW) may be requested and/or the requirements updates (Doc Only) will be included in a future version of the Industry Specification(s).
- Implemented – The Change Order was adopted and has been implemented in the NPAC system.
Summary & Guidelines
Title | Date Originated | Description | Status | Document |
---|---|---|---|---|
NANC 390 | 10/16/2003 | New Interface Confirmation Messages SOA/LSMS- to- NPAC | Closed | Download |
NANC 389 | 10/16/2003 | Performance Test-Bed | Closed | Download |
NANC 388 v2 | 05/11/2006 | Un-do a “Cancel Pending” SV | Implemented | Download |
NANC 388 | 09/17/2003 | Un-do a “Cancel Pending” SV | Implemented | Download |
NANC 387 | 09/03/2003 | Doc-Only Change Order: IIS Updates | Implemented | Download |
NANC 386 | 07/24/2003 | Single Association for SOA/LSMS | Implemented | Download |
NANC 385 | 07/10/2003 | Timer Calculation – Maintenance Window Timer Behavior | Implemented | Download |
NANC 384 | 06/05/2003 | NPAC Change Order Effectiveness Metrics | Closed | Download |
NANC 383 | 05/06/2003 | Separate SOA channel for notifications | Implemented | Download |
NANC 382 | 04/04/2003 | “Port-Protection” System | Closed | Download |
NANC 381 | 01/27/2003 | Doc Only Change Order: FRS Updates | Implemented | Download |
NANC 380 | 01/23/2003 | Doc Only Change Order: IIS Updates | Open | Download |
NANC 379 | 12/11/2002 | Doc Only Change Order: Update IIS Flow, 5.1.18 | Implemented | Download |
NANC 378 | 12/05/2002 | Doc Only Change Order: Missing IIS Flow for cancellation of a disconnect-pending SV | Implemented | Download |
NANC 377 | 12/04/2002 | Doc Only Change Order: Missing IIS Flow for 2nd Create by Old SP with Auth=FALSE | Implemented | Download |
NANC 376 | 12/02/2002 | Doc Only Change Order: Modify Active with Failed List | Implemented | Download |
NANC 375 | 11/27/2002 | Limiting Ability to Remove Conflict Status with Certain Cause Code Values | Implemented | Download |
NANC 374 | 11/20/2002 | Doc Only Change Order: PTO SP | Implemented | Download |
NANC 373 | 11/19/2002 | Doc Only Change Order: Conflict AVC | Implemented | Download |
NANC 372 | 11/15/2002 | SOA/LSMS Interface Protocol Alternatives | Implemented | Download |
NANC 371 | 11/06/2002 | Doc Only Change Order for Audits: Update Behavior | Implemented | Download |
NANC 370 | 10/23/2002 | NPAC Maintenance Mode | Closed | Download |
NANC 369 | 10/23/2002 | Doc Only Change Order for IIS: Flow Updates | Implemented | Download |
NANC 368 | 10/18/2002 | Outbound Flow Control | Implemented | Download |
NANC 367 | 09/20/2002 | Doc Only Change Order for FRS: Requirements Updates | Implemented | Download |