Change Orders
The Change Order section contains descriptions of the business functionality of the Number Portability Administration Center Service Management System (NPAC/SMS) as defined by the Number Portability Industry Forum (NPIF). The NPIF was formerly known as the Local Number Portability Administration Working Group (LNPA WG). Change Orders created/managed prior to the restructuring are identified with ‘NANC’ before the Change Order number. The NPIF has a direct relationship to the processes and systems that each Service Provider uses to participate in Number Portability.
When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required.
In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.
The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:
- Closed – The Change Order was considered and rejected.
- Open – The Change Order has been considered and there may be further discussion.
- Requested – The NPIF has reached agreement on the Change Order and either a Statement of Work (SOW) may be requested and/or the requirements updates (Doc Only) will be included in a future version of the Industry Specification(s).
- Implemented – The Change Order was adopted and has been implemented in the NPAC system.
Summary & Guidelines
Title | Date Originated | Description | Status | Document |
---|---|---|---|---|
NANC 100 | 05/21/1997 | NANC IIS 1.1, section 10 Subscription Version Status Row 1 | Implemented | Download |
NANC 099 | 05/21/1997 | NANC IIS 1.1, section 10 Subscription Version Status Row 2 | Implemented | Download |
ILL 098 | 11/19/1996 | Limit of Mass Update Range | Closed | Download |
NANC 098 | 05/22/1997 | TSAP data required in FRS | Implemented | Download |
NANC 097 | 05/15/1997 | OID usage and NpacAssociationUserInfo | Implemented | Download |
NANC 096 | 05/12/1997 | T2 Timers not on subscriptionVersionNPAC | Implemented | Download |
NANC 095 | 05/12/1997 | Reference: IIS NANC 1.1, section 4.2.2 | Implemented | Download |
NANC 094 | 05/12/1997 | IIS NANC 1.1, section 4.2.1 | Implemented | Download |
NANC 093 | 05/13/1997 | Date and Time in GDMO/ASN.1 | Implemented | Download |
NANC 092 | 05/04/1997 | Flow 6.5.3.2 Clarification | Implemented | Download |
NANC 091 | 05/01/1997 | IIS Section 4.2.2 | Implemented | Download |
NANC 090 | 04/30/1997 | SP Download Indicator Addition to IIS | Closed | Download |
NANC 089 | 05/01/1997 | Action Scoping and Filtering Support | Implemented | Download |
NANC 088 | 05/01/1997 | Id Naming attributes Non-zero | Implemented | Download |
NANC 087 | 04/30/1997 | RR5-39 requirement modification | Closed | Download |
NANC 086 | 04/30/1997 | Unique NPAC customer Ids | Implemented | Download |
NANC 085 | 04/30/1997 | Flow 6.5.5.1 Modification | Implemented | Download |
NANC 084 | 04/30/1997 | LnpNetwork behavior update | Implemented | Download |
NANC 083 | 05/01/1997 | NPAC Time Synchronization | Implemented | Download |
NANC 082 | 04/18/1997 | Audit Download Filtered LSMS | Closed | Download |
NANC 081 | 04/18/1997 | Audit Download Filtered LSMS | Closed | Download |
NANC 080 | 04/18/1997 | Audit indication of SP’s not Audited Due to a Download Filter | Closed | Download |
NANC 079 | 04/18/1997 | Multiple SPIDs per Service Provider LSMS | Closed | Download |
ILL 079 | 11/19/1996 | Notification Recovery | Implemented | Download |
NANC 078 | 04/22/1997 | OID usage and NpacAssociationUserInfo | Implemented | Download |