Change Orders
The Change Order section contains descriptions of the business functionality of the Number Portability Administration Center Service Management System (NPAC/SMS) as defined by the Number Portability Industry Forum (NPIF). The NPIF was formerly known as the Local Number Portability Administration Working Group (LNPA WG). Change Orders created/managed prior to the restructuring are identified with ‘NANC’ before the Change Order number. The NPIF has a direct relationship to the processes and systems that each Service Provider uses to participate in Number Portability.
When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required.
In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.
The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:
- Closed – The Change Order was considered and rejected.
- Open – The Change Order has been considered and there may be further discussion.
- Requested – The NPIF has reached agreement on the Change Order and either a Statement of Work (SOW) may be requested and/or the requirements updates (Doc Only) will be included in a future version of the Industry Specification(s).
- Implemented – The Change Order was adopted and has been implemented in the NPAC system.
Summary & Guidelines
Title | Date Originated | Description | Status | Document |
---|---|---|---|---|
NANC 191 | 01/19/1998 | DPC/SSN Value Edits | Implemented | Download |
NANC 190 | 01/19/1998 | NPA Split Requirement 33 Interpretation | Implemented | Download |
NANC 189 | 01/19/1998 | Service Provider Allowable Functions Modification | Implemented | Download |
ILL 188 | 02/24/1997 | FRS RR5-38.3 Consistency Problem | Implemented | Download |
NANC 188 | 01/19/1998 | Mass Update Flow 6.7.4 Modification | Implemented | Download |
ILL 187 | 02/22/1997 | NXX split handling for 6 digit | Closed | Download |
NANC 187 | 01/07/1998 | Linked Action Replies | Implemented | Download |
NANC 186 | 01/07/1998 | Linked Notification Recovery Reply | Closed | Download |
NANC 185 | 01/05/1998 | Notification Recovery Error Response | Implemented | Download |
NANC 184 | 01/05/1998 | Response for Notification Recovery not Linked | Implemented | Download |
ILL 183 | 02/14/1997 | Download of Service Provider Data ASN.1 Issue | Closed | Download |
NANC 183 | 01/05/1998 | PDU Size | Closed | Download |
NANC 182 | 01/07/1998 | NPA-NXX effective date validation | Implemented | Download |
ILL 181 | 02/24/1997 | Key’s for EACH Service Provider Interface | Implemented | Download |
NANC 181 | 12/08/1997 | Tag Value Addition to the ASN.1 for NANC 146 | Closed | Download |
NANC 180 | 12/07/1997 | Key Exchange Security Strengthening | Closed | Download |
NANC 179 | 11/25/1997 | TN Range Notifications | Implemented | Download |
NANC 178 | 11/25/1997 | NANC 048 Clarifications | Implemented | Download |
NANC 177 | 11/25/1997 | Clarification to ILL3 | Closed | Download |
NANC 176 | 11/15/1997 | Modification of Status Change Cause Code | Implemented | Download |
NANC 175 | 11/15/1997 | Timestamp default when not set | Implemented | Download |
NANC 174 | 11/14/1997 | Removal of SOA and LSMS combined association | Implemented | Download |
NANC 173 | 11/15/1997 | Flow 6.5.2.1 Modification | Implemented | Download |
NANC 172 | 11/05/1997 | LSMS accepting downloads in the Flows | Implemented | Download |
NANC 171 | 11/01/1997 | Audit Response Error Code Clarification | Implemented | Download |