Change Orders
The Change Order section contains descriptions of the business functionality of the Number Portability Administration Center Service Management System (NPAC/SMS) as defined by the Number Portability Industry Forum (NPIF). The NPIF was formerly known as the Local Number Portability Administration Working Group (LNPA WG). Change Orders created/managed prior to the restructuring are identified with ‘NANC’ before the Change Order number. The NPIF has a direct relationship to the processes and systems that each Service Provider uses to participate in Number Portability.
When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required.
In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.
The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:
- Closed – The Change Order was considered and rejected.
- Open – The Change Order has been considered and there may be further discussion.
- Requested – The NPIF has reached agreement on the Change Order and either a Statement of Work (SOW) may be requested and/or the requirements updates (Doc Only) will be included in a future version of the Industry Specification(s).
- Implemented – The Change Order was adopted and has been implemented in the NPAC system.
Summary & Guidelines
Title | Date Originated | Description | Status | Document |
---|---|---|---|---|
NANC 291 | 07/07/1999 | SSN Edits in the NPAC SMS | Implemented | Download |
NANC 290 | 06/14/1999 | Documentation Change – FRS RR3-13.2 and R5-19.6 wording changes | Implemented | Download |
NANC 289 | 05/27/1999 | R3 Requirements Update – documentation only – from Pooling Assumptions walk-thru | Implemented | Download |
NANC 288 | 05/13/1999 | GDMO Changes for 2.x from 3.x updates for Failed SP List | Implemented | Download |
NANC 287 | 05/27/1999 | ASN.1 Change for Required Field in VersionNewNPA-NXX and VersionNewNPA-NXX-Recovery Notification | Implemented | Download |
NANC 286 | 05/17/1999 | Maximum Subscriber Query Name Change and Default Value Change | Implemented | Download |
NANC 285 | 05/12/1999 | SOA/LSMS Requested Subscription Version Query Max Size | Implemented | Download |
NANC 284 | 05/03/1999 | GDMO Doc Only Change for Object, Action, Notification errors | Implemented | Download |
NANC 283 | 04/30/1999 | GDMO Doc Only Change for Business Type and WSMSC | Implemented | Download |
NANC 282 | 04/30/1999 | GDMO Change for WSMSC backwards compatibility | Implemented | Download |
NANC 281 | 04/30/1999 | IIS Doc Change for New Conflict Removal Flow | Implemented | Download |
NANC 280 | 04/19/1999 | Clarification for Notification Recovery Limitation | Implemented | Download |
NANC 279 | 04/16/1999 | SOA Resynchronization for Large Ranges | Closed | Download |
NANC 278 | 04/05/1999 | FRS Documentation - SV requirements | Implemented | Download |
NANC 277 | 04/01/1999 | IIS Documentation – Modify Active SV B.5.2.1 | Implemented | Download |
NANC 276 | 04/01/1999 | IIS Documentation – Immediate Disconnect B.5.4.1 | Implemented | Download |
NANC 275 | 03/31/1999 | IIS Documentation - Error Flow Diagrams Needed | Implemented | Download |
NANC 274 | 03/24/1999 | LTI push button placement for Subscription Versions | Closed | Download |
NANC 273 | 03/24/1999 | LTI Subscription Version Query Max Size | Implemented | Download |
NANC 272 | 03/24/1999 | Documentation change for Audit status | Implemented | Download |
NANC 271 | 03/24/1999 | Documentation change for Single TN Audit | Implemented | Download |
NANC 270 | 03/16/1999 | Documentation change for Re-Send | Implemented | Download |
NANC 269 | 03/16/1999 | Documentation change for Bulk Data Download | Implemented | Download |
NANC 268 | 03/16/1999 | Documentation change for Mass Update | Implemented | Download |
NANC 267 | 02/25/1999 | ASN.1 Change | Implemented | Download |