Change Orders
The Change Order section contains descriptions of the business functionality of the Number Portability Administration Center Service Management System (NPAC/SMS) as defined by the Number Portability Industry Forum (NPIF). The NPIF was formerly known as the Local Number Portability Administration Working Group (LNPA WG). Change Orders created/managed prior to the restructuring are identified with ‘NANC’ before the Change Order number. The NPIF has a direct relationship to the processes and systems that each Service Provider uses to participate in Number Portability.
When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required.
In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.
The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:
- Closed – The Change Order was considered and rejected.
- Open – The Change Order has been considered and there may be further discussion.
- Requested – The NPIF has reached agreement on the Change Order and either a Statement of Work (SOW) may be requested and/or the requirements updates (Doc Only) will be included in a future version of the Industry Specification(s).
- Implemented – The Change Order was adopted and has been implemented in the NPAC system.
Summary & Guidelines
Title | Date Originated | Description | Status | Document |
---|---|---|---|---|
NANC 316 | 08/16/2000 | Change the NSAP Field Size Declaration in ASN.1 – ASN.1 Recompile | Implemented | Download |
NANC 315 | 08/10/2000 | FRS Document Only Change – NSAP Field Size | Implemented | Download |
NANC 314 | 07/05/2000 | FRS Documentation Only Change – Subscription and Block Download File section in Appendix E have incorrect DPC data examples. | Implemented | Download |
NANC 313 | 07/05/2000 | FRS Documentation Only Change – Bulk Data Download Files for NPA-NXX-X and Block Data to be Delivered in GMT instead of Central Time. | Implemented | Download |
NANC 312 | 06/14/2000 | Different User Levels on the LTI | Closed | Download |
NANC 311 | 06/05/2000 | Query Message of SP Association Status | Closed | Download |
NANC 310 | 02/18/2000 | Time Reference in the NPAC SMS | Closed | Download |
NANC 309 | 02/14/2000 | Block Transition Diagram in FRS and IIS | Implemented | Download |
NANC 308 | 02/09/2000 | R3 GDMO update for First Port Notification Removal from NPA-NXX-X Object | Implemented | Download |
NANC 307 | 02/04/2000 | Change BDD Format for NPA-NXX and NPA-NXX-X Files | Closed | Download |
NANC 306 | 01/24/2000 | R3 GDMO update for WSMSC Package | Implemented | Download |
NANC 305 | 01/24/2000 | R3 ASN.1 documentation-only updates | Implemented | Download |
NANC 304 | 01/24/2000 | R3 GDMO documentation-only updates | Implemented | Download |
NANC 303 | 01/24/2000 | R3 IIS documentation-only updates | Implemented | Download |
NANC 302 | 01/24/2000 | R3 FRS documentation-only updates | Implemented | Download |
NANC 301 | 01/12/2000 | NPAC Monitoring of SOA and LSMS Associations via NPAC TCP Level Heartbeat (transport layer) | Implemented | Download |
NANC 300 | 12/06/1999 | 7-digit Block Filters for Number Pooling | Implemented | Download |
NANC 299 | 09/15/1999 | NPAC Monitoring of SOA and LSMS Associations via Heartbeat | Implemented | Download |
NANC 298 | 09/15/1999 | Line Level Splits (10 digits) | Closed | Download |
NANC 297 | 09/15/1999 | Sending SV Problem During Recovery | Implemented | Download |
NANC 296 | 08/24/1999 | Documentation Change for Central Standard Time | Implemented | Download |
NANC 295 | 08/19/1999 | Documentation Updates to the National Number Pooling requirements, IIS Flows, ASN.1, GDMO | Implemented | Download |
NANC 294 | 08/11/1999 | Changing Due Date Edit Functionality in the NPAC SMS for 7PM on Due Date Problems | Implemented | Download |
NANC 293 | 08/11/1999 | Skipping Time Portion of Due Date Edits in the NPAC SMS | Closed | Download |
NANC 292 | 07/07/1999 | FRS Documentation Update – Query SV Valid Statuses | Implemented | Download |