Change Orders
The Change Order section contains descriptions of the business functionality of the Number Portability Administration Center Service Management System (NPAC/SMS) as defined by the Number Portability Industry Forum (NPIF). The NPIF was formerly known as the Local Number Portability Administration Working Group (LNPA WG). Change Orders created/managed prior to the restructuring are identified with ‘NANC’ before the Change Order number. The NPIF has a direct relationship to the processes and systems that each Service Provider uses to participate in Number Portability.
When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required.
In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.
The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:
- Closed – The Change Order was considered and rejected.
- Open – The Change Order has been considered and there may be further discussion.
- Requested – The NPIF has reached agreement on the Change Order and either a Statement of Work (SOW) may be requested and/or the requirements updates (Doc Only) will be included in a future version of the Industry Specification(s).
- Implemented – The Change Order was adopted and has been implemented in the NPAC system.
Summary & Guidelines
| Title | Date Originated | Description | Status | Document |
|---|---|---|---|---|
| ILL 066 | 11/08/1996 | Network Level Activation Capability | Closed | Download |
| NANC 065 | 04/02/1997 | Flow 6.5.1.3/6.5.1.4 attributeValueChange Notification Clarification | Implemented | Download |
| ILL 065 | 11/08/1996 | Network Level Audit | Closed | Download |
| NANC 064 | 04/02/1997 | Flow 6.5.1.1/6.5.1.2 objectCreation Notification Clarification | Implemented | Download |
| NANC 063 | 04/03/1997 | Flow 6.5.1.1 and 6.5.1.2 Modifications | Implemented | Download |
| NANC 062 | 04/03/1997 | Filter NPA-NXX Object Behavior Description/Modification | Implemented | Download |
| NANC 061 | 04/03/1997 | SubscriptionVersionModify Behavior Modification | Implemented | Download |
| NANC 060 | 04/03/1997 | Range Operation Clarification | Implemented | Download |
| NANC 059 | 04/11/1997 | Old SP Concurrence Request Notification | Implemented | Download |
| NANC 058 | 04/01/1997 | Data Download for a Modify | Implemented | Download |
| ILL 058 | 10/29/1996 | Single Audit Report Modification | Closed | Download |
| NANC 057 | 03/27/1997 | Digital Signature Clarification | Implemented | Download |
| NANC 056 | 03/27/1997 | Flow 6.5.2.3 and 6.5.2.4 corrections | Implemented | Download |
| NANC 055 | 03/26/1997 | Not recorded | Closed | Download |
| NANC 054 | 03/26/1997 | Definition of Cause Code Values | Implemented | Download |
| NANC 053 | 03/27/1997 | Chapter 10 Modifications | Implemented | Download |
| NANC 052 | 03/27/1997 | Flow 6.5.2.1, 6.5.2.3, and 6.5.3.1 Modification | Implemented | Download |
| NANC 051 | 03/26/1997 | OID Modification | Implemented | Download |
| NANC 050 | 03/27/1997 | Flow 6.5.1.6.2 Clarification | Implemented | Download |
| NANC 049 | 03/26/1997 | Multiple SP Contacts for a Contact Type | Closed | Download |
| NANC 048 | 03/24/1997 | Multiple SPIDs per Service Provider SOA | Implemented | Download |
| NANC 047 | 03/24/1997 | Time Zone | Closed | Download |
| NANC 046 | 03/24/1997 | NPAC to NPAC | Closed | Download |
| NANC 045 | 03/24/1997 | Audit a list of Service Providers | Closed | Download |
| NANC 044 | 03/24/1997 | Effective Release Date Validation | Closed | Download |