Change Orders
The Change Order section contains descriptions of the business functionality of the Number Portability Administration Center Service Management System (NPAC/SMS) as defined by the Number Portability Industry Forum (NPIF). The NPIF was formerly known as the Local Number Portability Administration Working Group (LNPA WG). Change Orders created/managed prior to the restructuring are identified with ‘NANC’ before the Change Order number. The NPIF has a direct relationship to the processes and systems that each Service Provider uses to participate in Number Portability.
When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required.
In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.
The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:
- Closed – The Change Order was considered and rejected.
- Open – The Change Order has been considered and there may be further discussion.
- Requested – The NPIF has reached agreement on the Change Order and either a Statement of Work (SOW) may be requested and/or the requirements updates (Doc Only) will be included in a future version of the Industry Specification(s).
- Implemented – The Change Order was adopted and has been implemented in the NPAC system.
Summary & Guidelines
| Title | Date Originated | Description | Status | Document |
|---|---|---|---|---|
| NANC 043 | 03/20/1997 | Report of SPs who initiated Audits for Another SP | Closed | Download |
| NANC 042 | 03/20/1997 | Documentation of lnpLocal-SMS-Name Value | Implemented | Download |
| NANC 041 | 03/20/1997 | SubscriptionModifyData ASN.1 Tagging Correction | Implemented | Download |
| NANC 040 | 03/20/1997 | SOA flows for NPA-NXX filter management | Implemented | Download |
| NANC 039 | 03/20/1997 | Section 4.2.2 Correction | Implemented | Download |
| NANC 038 | 03/20/1997 | IIS Flow 6.4.1.6 Clarification | Implemented | Download |
| NANC 037 | 03/18/1997 | Primitive Error List Modification | Implemented | Download |
| NANC 036 | 03/18/1997 | Low-tech Interface Requirements | Implemented | Download |
| NANC 035 | 03/17/1997 | ContactPagerPin ASN.1 Modification | Implemented | Download |
| NANC 034 | 03/17/1997 | AuditServiceProvIdRange ASN.1 Modification | Implemented | Download |
| NANC 033 | 03/17/1997 | IIS subscriptionAuditBehavior Modification | Implemented | Download |
| NANC 032 | 03/17/1997 | IIS serviceProvNPA-NXX-Behavior Modification | Implemented | Download |
| NANC 031 | 03/17/1997 | IIS subscriptionOld/NewSP-DueDate Behavior Modification | Implemented | Download |
| NANC 030 | 03/17/1997 | Attribute Behavior Updates | Implemented | Download |
| NANC 029 | 03/17/1997 | IIS subscriptionLNPType Behavior Modification | Implemented | Download |
| NANC 028 | 03/17/1997 | IIS subscriptionVersionBehavior Modification | Implemented | Download |
| NANC 027 | 03/17/1997 | IIS servProvLRN-Behaviour Modification | Implemented | Download |
| NANC 026 | 03/17/1997 | IIS 6.5.5.2 Flow Modification | Implemented | Download |
| NANC 025 | 03/17/1997 | IIS 6.5.4.1/6.5.4.2 Flow Modification | Implemented | Download |
| NANC 024 | 03/17/1997 | IIS 6.5.1.2/6.5.1.3 Flow Modification | Implemented | Download |
| NANC 023 | 03/17/1997 | IIS 6.2.1 Flow Modification | Implemented | Download |
| NANC 022 | 03/05/1997 | IIS 6.5.6 Flow modification | Implemented | Download |
| NANC 021 | 03/05/1997 | IIS Section 6 note modification | Implemented | Download |
| NANC 020 | 03/05/1997 | Addition of InpSpecificInfoParameter | Implemented | Download |
| NANC 019 | 03/05/1997 | Rewording of M-CANCEL-GET note | Implemented | Download |