Change Orders
The Change Order section contains descriptions of the business functionality of the Number Portability Administration Center Service Management System (NPAC/SMS) as defined by the Number Portability Industry Forum (NPIF). The NPIF was formerly known as the Local Number Portability Administration Working Group (LNPA WG). Change Orders created/managed prior to the restructuring are identified with ‘NANC’ before the Change Order number. The NPIF has a direct relationship to the processes and systems that each Service Provider uses to participate in Number Portability.
When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required.
In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.
The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:
- Closed – The Change Order was considered and rejected.
- Open – The Change Order has been considered and there may be further discussion.
- Requested – The NPIF has reached agreement on the Change Order and either a Statement of Work (SOW) may be requested and/or the requirements updates (Doc Only) will be included in a future version of the Industry Specification(s).
- Implemented – The Change Order was adopted and has been implemented in the NPAC system.
Summary & Guidelines
| Title | Date Originated | Description | Status | Document |
|---|---|---|---|---|
| NANC 018 | 03/05/1997 | ASN.1 Comment for NetworkDownloadCriteria | Implemented | Download |
| NANC 017 | 03/05/1997 | ASN.1 addition of word EXPLICT for tagging | Implemented | Download |
| ILL 017 | 10/15/1996 | Report Size Warning | Closed | Download |
| NANC 016 | 03/05/1997 | Retry wording clarification in IIS | Implemented | Download |
| NANC 015 | 03/05/1997 | FRS GDMO Definition Correction | Implemented | Download |
| NANC 014 | 03/05/1997 | GDMO Document References | Implemented | Download |
| NANC 013 | 03/05/1997 | Notification of T2 expiration to Old SP | Implemented | Download |
| NANC 012 | 05/05/1997 | Conflict Restriction Window Tunable Clarification/Modification | Implemented | Download |
| NANC 011 | 03/05/1997 | Business Day Default rewording | Implemented | Download |
| ILL 011 | 10/17/1996 | Portability Area Utilities, Screen, and Report Enhancements | Closed | Download |
| NANC 010 | 03/02/1997 | SystemType ASN.1 | Implemented | Download |
| ILL 010 | 10/17/1996 | Billing Enhancements | Closed | Download |
| NANC 009 | 01/27/1997 | Removal of all Requirements in Sections 6.1 and 6.2 | Implemented | Download |
| ILL 009 | 10/17/1996 | Portability Area Specific Tunables | Closed | Download |
| NANC 008 | 01/27/1997 | Deletion/Modification of Requirements in Section 10 | Implemented | Download |
| ILL 008 | 10/17/1996 | Portability Areas | Closed | Download |
| NANC 007 | 01/27/1997 | Removal of “NOT A SYSTEM REQUIREMENT” | Implemented | Download |
| NANC 006 | 01/27/1997 | Addition of R5-19.2 and RR5-6.9 | Implemented | Download |
| NANC 005 | 01/27/1997 | Removal of Section 1.7 Related Publications | Implemented | Download |
| ILL 005 | 10/15/1996 | Round-Robin Broadcasts Across LSMS Associations | Closed | Download |
| NANC 004 | 01/27/1997 | Removal of Assumptions | Implemented | Download |
| NANC 003 | 01/27/1997 | Removal of Unnecessary Illinois references | Implemented | Download |
| ILL 003 | 10/15/1996 | Enhancements to Screening of NPA-NXX Broadcasts | Closed | Download |
| NANC 002 | 01/27/1997 | Preface on Number Scheme | Implemented | Download |
| NANC 001 | 01/27/1997 | Document Title Changes | Implemented | Download |