Change Orders

The Change Order section contains descriptions of the business functionality of the Number Portability Administration Center Service Management System (NPAC/SMS) as defined by the Number Portability Industry Forum (NPIF). The NPIF was formerly known as the Local Number Portability Administration Working Group (LNPA WG). Change Orders created/managed prior to the restructuring are identified with ‘NANC’ before the Change Order number. The NPIF has a direct relationship to the processes and systems that each Service Provider uses to participate in Number Portability. 

When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required. 

In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.

The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:

  • Closed – The Change Order was considered and rejected.
  • Open – The Change Order has been considered and there may be further discussion.
  • Requested – The NPIF has reached agreement on the Change Order and either a Statement of Work (SOW) may be requested and/or the requirements updates (Doc Only) will be included in a future version of the Industry Specification(s).
  • Implemented – The Change Order was adopted and has been implemented in the NPAC system.


Summary & Guidelines


Title Date Originated Description Status Document
NANC 546 07/09/2019 XIS – Doc-only Changes Implemented Download
NANC 545 07/09/2019 GDMO – Doc-only Changes Implemented Download
NANC 544 07/09/2019 FRS – Doc-only Changes Implemented Download
NANC 543 05/07/2019 Vendor Certification and Regression Test Plan – Doc Only Updates for Release 5.0 Implemented Download
NANC 542 05/07/2019 Retry Timer Intervals – Doc Only Updates Implemented Download
NANC 541 05/07/2019 Time Based Recovery Limit Implemented Download
NANC 540 05/07/2019 Vendor Certification and Regression Test Plan – doc-only updates Implemented Download
NANC 539 03/05/2019 Vendor Certification and Regression Test Plan Updates – Doc Only Updates Implemented Download
NANC 538 03/05/2019 Expanded Deletion of Inactive SPIDs Implemented Download
NANC 537 12/05/2018 MUMP Due Date Matching Implemented Download
NANC 536 11/06/2018 MUMP Email Notification List Implemented Download
NANC 535 11/06/2018 Service Provider Deletion Validations for Alt SPID and Last Alt SPID Implemented Download
NANC 534 11/06/2018 Reference Data updates for new NPA-NXXs - Doc Only Change Implemented Download
NANC 533 11/06/2018 Audits with Activation Timestamp Range Implemented Download
NANC 532 11/06/2018 MUMP File Formats – Doc Only Change Implemented Download
NANC 531 09/12/2018 Recovery and Roll-up Implemented Download
NANC 530 09/11/2018 Hold/Replay Clarifications Implemented Download
NANC 529 09/11/2018 Multiple SVs for TN in BDD File Implemented Download
NANC 528 09/11/2018 Transition Related GDMO/ASN.1/XSD updates Implemented Download
NANC 527 06/05/2018 Modify SV AVC Notifications Implemented Download
NANC 526 06/05/2018 SIC SMURF File Production Implemented Download
NANC 525 07/10/2018 MUMP Mass Pooling Implemented Download
NANC 524 07/10/2018 MUMP File layouts – Near Term Implemented Download
NANC 523 04/24/2018 Implicit NPAC SMS Requirements Implemented Download
NANC 522 06/05/2018 BDD Files SSN Field Implemented Download