The Change Order section contains descriptions of the business
functionality of the Number Portability Administration Center (NPAC)
Service Management System (SMS) as defined by the Number Portability
Industry Forum (NPIF). The NPIF was formerly known as the Local Number
Portability Administration Working Group (LNPA WG) until November 2020
when the group was restructured. Change Orders created/managed prior to
the restructuring are identified with ‘NANC’ before the Change Order
number. The NPIF has a direct relationship to the processes and systems
that each Service Provider uses to participate in Number Portability.
When a change in the NPAC software design is discussed at the NPIF, the proposed change eventually is described in the form of a Change Order. The Change Order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal. As discussions progress, the technical portion of the Change Order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented. Doc Only Change Orders may also be utilized to update Industry Specification(s) as required.
In this section of the NPIF web site, all Change Orders ever considered are listed. The final Change Order document and the NPIF discussion notes, the Change Order status, and the identity of the software release in which the change order was implemented, are provided in the Change Order Summaries located below.
The status of a Change Order may be either Closed, Open, Requested, or Implemented. These terms are defined as follows:
Title | Date Originated | Description | Status | Documents |
---|---|---|---|---|
NANC 479 | 01/21/2016 | FRS Doc-Only Clarifications | Implemented | Download |
NANC 478 | 09/03/2015 | FRS ASN.1 – Pre Cancellation Status of Disconnect Pending | Implemented | Download |
NANC 477 | 09/03/2015 | GDMO – Service Provider Type Definition | Implemented | Download |
NANC 476 | 09/03/2015 | Change Pool Block Error Requirements | Implemented | Download |
NANC 475 | 09/03/2015 | Change User Login Restriction Requirement | Implemented | Download |
NANC 474 | 09/03/2015 | ASN.1 – SWIM Recovery | Implemented | Download |
NANC 473 | 09/03/2015 | ASN.1 – AddressInformation | Implemented | Download |
NANC 472 | 09/03/2015 | ASN.1 – Audit Discrepancy Report | Implemented | Download |
NANC 471 | 09/03/2015 | ASN.1 – SV DisconnectReply | Implemented | Download |
NANC 470 | 09/03/2015 | Change SSL VPN Requirement | Implemented | Download |
NANC 469 | 09/03/2015 | Change Network Monitoring Requirement | Implemented | Download |
NANC 468 | 09/03/2015 | Phone Conversation Requirement | Implemented | Download |
NANC 467 | 09/03/2015 | ASN.1 – CMIP lnpRecoveryComplete Action reply | Implemented | Download |
NANC 466 | 09/03/2015 | Change Offline Batch Download File Requirement | Implemented | Download |
NANC 465 | 07/10/2015 | Turn-Up Test Plan Doc-Only Clarifications | Implemented | Download |
NANC 464 | 07/10/2015 | GDMO Behavior Doc-Only Clarifications | Implemented | Download |
NANC 463 | 07/10/2015 | IIS/EFD Doc-Only Clarifications | Implemented | Download |
NANC 462 | 07/10/2015 | FRS Doc-Only Clarifications | Implemented | Download |
NANC 461 | 07/07/2015 | Sunset List –Local System Impact | Implemented | Download |
NANC 460 | 07/07/2015 | Sunset List Items – Local System Impact = No | Implemented | Download |
NANC 459 | 03/03/2015 | Doc-Only LTI Unused User ID Disable Period | Implemented | Download |
NANC 458 | 04/30/2014 | Service Provider-requested Notification Suppression | Implemented | Download |
NANC 457 | 07/09/2013 | SPID Migration TN Count | Closed | Download |
NANC 456 | 07/09/2013 | Elimination of Five-Day First-Port Waiting Period | Implemented | Download |
NANC 455 | 05/08/2013 | Update SP Type and SV Type for FCC VoIP Numbering Trial | Implemented | Download |
581 results returned